
German Graphitising
Furnaces
at Meitingen
(Siemens Plania)
BIOS 337
Reported by
W.B.C.
Perrycoste, M.A.P.
16 February,
1946
Metallurgy
BIOS Target
Numbers
C21/794,
C31/808, C22/2866
Keywords:
Object of visit; Personnel interviewed; Bom damage;
General Description of Factory; Power Supply; The target was included in the
list for the Team inspecting Aluminium Reduction Factories .. ; The memebers of
this Team did not feel themselves qualified to undertake a critical
investigation .. ; Dr. Minstring (Manager) Herr Gerhard Production
Superinintendent Dr. Hubmann Electrical Engineer; Power Supply 9,000,000 kWH per
month ... ; furnaces .. single phase up to 50,000 amps at 50/150 volts ... ;
furnace details .. ;Carborundum .. ; Basic wages had not altered since before
the war ...
Please return
to, or proceed with: FIAT-CIOS-BIOS index pages
Please go back
to, or proceed with: Handbooks papers and product
information
